— 11 —
SYSTEM INSTALLER’S GUIDE - CHECK LIST
CHECKOUT PROCEDURE
(After completion, review and leave with home owner or as directed)
Date of Installation
Model Number
Serial Number
Installing Contractor Name
Installing Contractor Phone Number
After installation has been completed, it is required that the entire system be checked against
the following list:
1. Refrigerant Line, Leak checked
(
)
2. Vapor Lines and Fittings properly insulated?
(
)
3. Have passages through masonry been sealed? If mortar is used,
prevent mortar from coming in direct contact with copper tubing
(
)
4. Indoor coil drains freely. Pour water into drain pan.
(
)
5. Supply registers and return grilles are open and unobstructed.
(
)
6. Return air filter installed.
(
)
7. Thermostat thermometer is accurate, and thermostat is level.
(
)
8. Is correct speed tap being used? (Indoor blower motor)
(
)
9. Does the condenser fan blade rotate freely, and is it tight on the shaft?
(
)
10. Are both indoor and outdoor sections level?
(
)
11. Are the units properly supported?
(
)
12. Is outdoor section properly located on concrete base or equivalent?
(
)