10
INSTALLATION OF UNIT
ENGLISH
Preparation of installation parts and tools
No.
Installation Parts, Tools
Use
1
Flaring tool (Ø 9.52 - Ø 15.88)
Flaring the pipes
2
Remear
Remove burrs from cut edges of pipes.
3
Pipe cutter (MAX 35 mm Copper pipe)
Cutting the pipings
4
Wrench (H5, H4 hexagonal wrench)
To open the service valve
5
Pipe bender
Bending the pipings
6
Leak detector
Check a gas-leakage of connecting part of the
pipings
7
Manifold gauge
To measure the pressure, to charge the re-
frigerant
8
Charge-nipple
To connect the bombe
9
Vacuum pump
To remove the air in the pipe.
10
Charge cylinder balance
To measure the refrigerant amount
11
Bombe (R410A)
Gas charge
Cleaning the pipe
12
Spanner
To tighten the connecting parts of the pipings
13
Monkey spanner
14
Driver( , )
Cutting the wires
15
Benchi (150 mm)
To measure the length
16
Tapeline
To make holes through the concrete wall and
blocks
17
Core drill
18
Voltmeter, Amperemeter, Clampmeter
To measure the current and voltage
19
Insulation resistance tester
To measure the insulation resistance
20
Glass thermometer
To measure the intake and outlet air tempera-
ture of the indoor unit
21
Copper tubes
To use the connecting pipings
22
Insulation material
To cover the connecting pipings
23
Tape
To finish the connecting pipings
24
Electrical Leakage Breaker
To shut off the main power
25
Cable
To connect the cable from outdoor unit to in-
door unit
26
Drain hose sockets, elbows
To remote the condensing water
Summary of Contents for APUC488TLA0
Page 22: ...22 ENGLISH ...
Page 23: ......