1
8
INSTALLATION OF UNIT
ENGLISH
Vacuum Drying of the Connecting Pipes and the Indoor Unit
The air which contains moisture remaining in the refrigeration cycle may cause a malfunction on
the compressor.
1
Confirm that both the liquid side valve and the gas side valve are set to the closed position.
2
After connecting the piping, check the joints for gas leakage with gas leak detector.
3
Remove the service port nut, and connect the gauge manifold and the vacuum pump to the
service port by the charge hose.
4
Vacuum the indoor unit and the connecting pipes until the pressure in them lowers to below -
76 cmHg.
5
Remove the valve stem nuts, and fully open the stems of the 2-way and 3-way valves with a
hexagon wrench.
6
Tighten the valve stem nuts of the 2-way valve and 3-way valve.
7
Disconnect the charge hose and fit the nut to the service port.
(Tightening torque: 1.8 kg
·
m)
Indoor unit
Outdoor unit
Liquid side
CLOSE
OPEN
Vaccum pump
Gas side
Closed
Closed
2-way valve/
3
-way valve
3
-way
valve
Summary of Contents for APUC488TLA0
Page 22: ...22 ENGLISH ...
Page 23: ......