24
PIPE CONNECTION
ENGLISH
Preparation of Pipe
Main cause of gas leakage is defect in flaring
work. Carry out correct flaring work in the fol-
lowing procedure.
Cut the pipes and the cable.
- Use the accessory pipe kit or the pipes pur-
chased locally.
- Measure the distance between the indoor
and the outdoor unit.
- Cut the pipes a little longer than measured
distance.
- Cut the cable 1.5m longer than the pipe
length.
Burrs removal
- Completely remove all burrs from the cut
cross section of pipe.
- Put the end of the copper pipe to downward
direction as you remove burrs in order to
avoid to let burrs drop in the pipe.
Welding
- Pipe connections can be done on the front
side or on the side according to the installa-
tion environments.
- Be sure to let 0.2kgf/cm
2
Nitrogen flow in
the pipe when welding.
- If Nitrogen was not flown during welding,
many oxidized membranes may form inside
the pipe and disturb the normal operations of
valves and condensers.
Copper
tube
90
Slanted Uneven Rough
Pipe
Reamer
Point down
Refrigerant Pipe
Regulator
Nitrogen
Nitrogen
Direction
Taping
Valve
Front Pipe
Draw Out
Right Side Pipe
Draw Out
Bottom Side Pipe
Draw Out
Rear Side Pipe
Draw Out
Summary of Contents for 62AWYU7L6
Page 57: ......