Industrial Ladder Tower
Double Width Tower Assembly Guide
Industrial Ladder Tower
Double Width Tower Assembly Guide
1.30 Ensure the frame clips are securely in place.
1.32 Then place the Fixed platform next to the trap door platform, so they are side by side.
Ensure there are no gaps between the platforms. They must be pushed together.
1.33 Climb through the trap door, as you did at point 1.21m. stay sitting on the platform, with
feet rest on the rung below.
Assembly Procedure
1.31 Insert the platform, once the braces are securely in place. The next platform should be
placed approx. 2m above the first. The rungs will vary, depending on the size frames you
have, but should be placed around 2m higher.
1.34 Place the handrails securely into place whilst sitting.
1.35 Stand on the platform, and ensure all braces are facing the correct way, and are securely
in place.