background image

Industrial Ladder Tower

Double  Width Tower Assembly Guide 

Industrial Ladder Tower

Double Width Tower Assembly Guide 

1.12  When fitting the stabilisers, position ach one in opposing directions, Adjust all four castors 

o ensure the tower is square and level – You can use a spirit level here to check. 

1.13

1.14 

1.16  Stabilisers must be in opposing directions to ensure full stability of tower.

1.17  Ensure spring clips are located in the locked position.

1.15

Assembly Procedure

Summary of Contents for 250 Industrial Tower

Page 1: ...Product Information and Assembly Guide 250 Industrial Tower Double Width Tower Assembly Guide...

Page 2: ...amage brake working z z Outriggers straight feet flat z z Inspect the equipment for damage regularly at least daily Double Width Tower Assembly Guide The Lewis Tower is a Class 3 Industrial Tower Syst...

Page 3: ...frame for assembly 1 2 Insert the Adjustable Leg and then the castor into the bottom of the frame 1 4 Insert the adjustable leg then the castor into the bottom of the frame 1 5 Clip the horizontal br...

Page 4: ...ing a sprit level Any alterations needed can be adjusted on the legs 1 7 Make sure the Trigger is facing the outside of the frame 1 8 Insert the next section this may vary in size depending on which t...

Page 5: ...he stabilisers position ach one in opposing directions Adjust all four castors o ensure the tower is square and level You can use a spirit level here to check 1 13 1 14 1 16 Stabilisers must be in opp...

Page 6: ...th an 8 Rung Section If you started to build the tower with the 4 Rung 1m frames then the 1st platform will be placed approx 4 Rungs above the frames This will vary depending on what section you have...

Page 7: ...diagonal braces into position 1 26 Stand on the platform and ensure the guardrail are securely in place at the opposite end of the tower 1 27 At this point a platform height of 2 2m has now been built...

Page 8: ...ether 1 33 Climb through the trap door as you did at point 1 21m stay sitting on the platform with feet rest on the rung below Assembly Procedure 1 31 Insert the platform once the braces are securely...

Page 9: ...e the erection procedure detailed in this guide above Stability Towers left unattended or unused for extended periods in exposed situations should be dismantled Horizontal forces i e pressure exerted...

Reviews: