background image

Product Information and Assembly Guide

250 Industrial Tower

Double Width Tower Assembly Guide

Summary of Contents for 250 Industrial Tower

Page 1: ...Product Information and Assembly Guide 250 Industrial Tower Double Width Tower Assembly Guide...

Page 2: ...amage brake working z z Outriggers straight feet flat z z Inspect the equipment for damage regularly at least daily Double Width Tower Assembly Guide The Lewis Tower is a Class 3 Industrial Tower Syst...

Page 3: ...frame for assembly 1 2 Insert the Adjustable Leg and then the castor into the bottom of the frame 1 4 Insert the adjustable leg then the castor into the bottom of the frame 1 5 Clip the horizontal br...

Page 4: ...ing a sprit level Any alterations needed can be adjusted on the legs 1 7 Make sure the Trigger is facing the outside of the frame 1 8 Insert the next section this may vary in size depending on which t...

Page 5: ...he stabilisers position ach one in opposing directions Adjust all four castors o ensure the tower is square and level You can use a spirit level here to check 1 13 1 14 1 16 Stabilisers must be in opp...

Page 6: ...th an 8 Rung Section If you started to build the tower with the 4 Rung 1m frames then the 1st platform will be placed approx 4 Rungs above the frames This will vary depending on what section you have...

Page 7: ...diagonal braces into position 1 26 Stand on the platform and ensure the guardrail are securely in place at the opposite end of the tower 1 27 At this point a platform height of 2 2m has now been built...

Page 8: ...ether 1 33 Climb through the trap door as you did at point 1 21m stay sitting on the platform with feet rest on the rung below Assembly Procedure 1 31 Insert the platform once the braces are securely...

Page 9: ...e the erection procedure detailed in this guide above Stability Towers left unattended or unused for extended periods in exposed situations should be dismantled Horizontal forces i e pressure exerted...

Reviews: