Correct installation of CT orientation on conductor from panel to load. This is an example of a three-phase installation.
Example of a split core CT.
Orientation is based on the product label indicating which
side should face the source.
Example of a solid core CT.
Orientation is based on the product label indicating which
side should face the source.
Use the appropriate diagram below to identify the correct orientation of the CT to the conductor. The “source”
refers to the side facing incoming power from the utility.
SECTION 4: INSTALLING CURRENT TRANSFORMERS TO MONITOR THE LOADS
SOURCE
LOAD
L
a
bel To Source
500V 50/60Hz 0
Output: 0.1A
Sentr
a
n C
SOURCE
LOAD
LOAD
LINE
WEB
VERSION