Fig. 5
Fig. 7
Fig. 8
Fig.9
Fig. 6
Step 5: Phase, Neutral and Ground Conductors
WARNING:
Use
ONLY
approved fittings and clamps to avoid
damage to wires.
a.
Bring the
phase
,
neutral
and
ground
conductors into the
enclosure through the bottom feed knockout.
b.
Connect the
phase
,
neutral
and
ground
conductors to the
appropriate terminals and torque to spec in the terminations
table
(fig. 5).
Step 6: Branch Circuit Breakers
WARNING:
Leviton
®
circuit breakers
MUST BE
used with a
Leviton
circuit breaker enclosure.
a.
Strip and connect the
load phase (M)
and
load neutral (N)
wires to the
load terminals (O)
and ground wire to the
ground
bus (P)
of the circuit breaker enclosure
(fig. 6)
. Strip wires
and torque load terminals to spec in the terminations table.
NOTE:
Ensure that the main breaker is in the OFF position
before installing any branch circuit breakers.
NOTE:
Ensure that all branch circuit breakers are in the OFF
position before installing into the panel.
b.
Align the
hooks and guides (Q)
of the branch circuit breaker
with the panel and press until breaker snaps into place
(fig. 7)
.
Step 7: Installing Deadfront
NOTE: Twist-outs (R)
must be removed for each position that contains
a branch circuit breaker. Fill any unused open spaces in cover using
filler plates
(see filler plate instructions)
.
a.
To remove
twist-outs (R)
, first strike with a screwdriver, then
twist with pliers until detached
(fig. 8)
.
b.
Install
deadfront (S)
by sliding it inward above the side wall
protrusions on each side at a 45-degree angle until bottom portion
of the
deadfront (S)
is seated into enclosure
(fig. 9)
.
c.
Secure the bottom of the
deadfront (S)
with the
securing
screw (T)
.
d.
Replace the meter and wiring compartment covers
(See Step 1)
.
Step 8: Complete the Installation
WARNING:
Before providing power to the load center,
check all electrical connections and confirm that the wiring
is correct.
WARNING:
Replace all doors and covers before connecting
power to this equipment.
a.
Ensure that the main and all branch circuit breakers are in the OFF
position. To energize, first turn ON the main breaker, and then turn
ON each individual branch circuit breaker.
SAVE THESE INSTRUCTIONS
For Technical Assistance Call: 1-800-824-3005 (U.S.A. Only)
1 800 405-5320 (Canada Only) www.leviton.com
PK-A3218-10-00-0B
© 2018 Leviton Mfg. Co., Inc.
TERMINATIONS
Termination Point
Wire Gauge
Strip Length
Torque
Phase & Neutral
Terminals
#3 AWG - 300 MCM
1.0 in.
375 in-lbs.
Ground Terminal
#4 AWG - 2/0 AWG
0.75 in.
50 in-lbs.
Load Phase
(brass)
#8 AWG - #4 AWG
#14 AWG - #10 AWG
0.40 in.
0.40 in.
45 in-lbs.
35 in-lbs.
Load Neutral
(silver)
#8 AWG - #4 AWG
#14 AWG - #10 AWG
0.40 in.
0.40 in.
45 in-lbs.
35 in-lbs.
Ground Bus
#6 AWG - #4 AWG
#8 AWG
#14 AWG - #10 AWG
0.50 in.
0.50 in.
0.50 in.
35 in-lbs.
25 in-lbs.
20 in-lbs.
Press until
breaker snaps
into place
Align hooks
and guides (Q)
Twist-outs
(R)
Neutral
Terminal
Ground
Terminal
Ground
bus
(P)
Phase
Terminals
Load
terminals
(O)
Lo
a
d ph
a
se (M)
Lo
a
d neutr
a
l (N)
45˚
Deadfront
(S)
Securing screw (T)
WEB
VERSION