3-3
Mounting
3
Mounting
The switch units can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
Rack Mounting
Before rack mounting the switch, pay particular attention to the following factors:
•
Temperature:
Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range. (See page C-2.)
•
Mechanical Loading:
Do not place any equipment on top of a rack-mounted unit.
•
Circuit Overloading:
Be sure that the supply circuit to the rack assembly is not
overloaded.
•
Grounding:
Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.
To rack-mount devices:
1.
Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.
Figure 3-2. Attaching the Brackets
Summary of Contents for FGL-2870
Page 1: ...LevelOne FGL 2870 24 FE 4 GE Combo SFP L2 SNMP Switch Installation Guide Version 1 0...
Page 2: ......
Page 4: ...FGL 2870 E122009 WM R01 149100000059A...
Page 12: ...viii...
Page 22: ...Introduction 1 6 1...
Page 36: ...3 8 Installing the Switch 3...
Page 52: ...C 4 Specifications C...
Page 59: ......