background image

REQUIRED PIPING METHOD #5

SYSTEM FIXTURES

HOT

WATER

SOURCE

COLD

SUPPLY

CIRCULATOR

AQUASTAT

BALANCING

HEAT

TRAP

VALVE

CHECK

FULL RETURN

LINE SIZE

VALVE #1

TEMPERED
RETURN

HIGH TEMPERATURE RETURN

BALANCING VALVE #2
WITH CHECK

BALL VALVE FOR

SETUP (OPTIONAL)

C

T

C

CIRCULATOR

HIGH TEMPERATURE FIXTURES

ISOLATION

VALVE

VALVE

CHECK

TEMPERED

PROCEDURE TO BALANCE CIRCULATION SYSTEM

1. MAKE SURE NO WATER IS BEING DRAWN IN THE BUILDING. OPEN BALANCING VALVE #1 

APPROXIMATELY HALF WAY AND START CIRCULATOR. KEEP BALANCE VALVE #2 CLOSED AT 
THIS TIME.

2. OBSERVE TEMPERATURE UNTIL IT STABILIZES.

3. CLOSE BALANCING VALVE #1 SLIGHTLY IF TEMPERATURE IS TOO HOT, OR OPEN  IT SLIGHTLY 

IF TEMPERATURE IS TOO COLD. ALLOW TEMPERATURE TO STABILIZE, REPEAT UNTIL DESIRED 
CIRCULATION TEMPERATURE IS SET.

4. IF UNABLE TO REACH DESIRED TEMPERATURE WITH VALVE #1 IN THE FULL OPEN POSITION, 

OPEN BALANCE VALVE #2 IN SMALL INCREMENTS (i.e. 1/8, ¼, 3/8, ETC) UNTIL DESIRED 
TEMPERATURE IS ACHIEVED.

REMEMBER! THIS IS A CONTROL DEVICE WHICH MUST BE CLEANED AND 

MAINTAINED ON A REGULAR BASIS (SEE MAINTENANCE GUIDE AND 
RECORD, MGR-1001).

5

Summary of Contents for TM-1520A-DT

Page 1: ...tem MUST be piped according to LEONARD S REQUIRED PIPING METHOD 5 see page 4 6 Refer to page 3 of this bulletin for correct Setup Instructions 1 Type TM Parallel Systems are factory pre assembled and...

Page 2: ...STOP SCREW located on the RIGHT SIDE OF THE COVER 5 The new maximum temperature has now been set Test this temperature by holding a thermometer under the flow of water to be certain it is as desired...

Page 3: ...STOP SCREW located on the RIGHT SIDE OF THE COVER 5 The new maximum temperature has now been set Test this temperature by holding a thermometer under the flow of water to be certain it is as desired...

Page 4: ...t V1L set outlet temperature of SVR mixing valve to the same temperature as STEP 7 14 Open all outlets System is operational To balance circulation system temperature see page 5 1 The Parallel Unit MU...

Page 5: ...G VALVE 1 APPROXIMATELY HALF WAY AND START CIRCULATOR KEEP BALANCE VALVE 2 CLOSED AT THIS TIME 2 OBSERVE TEMPERATURE UNTIL IT STABILIZES 3 CLOSE BALANCING VALVE 1 SLIGHTLY IF TEMPERATURE IS TOO HOT OR...

Page 6: ...will go then screw the port sleeve nut into the base The port sleeve and thimble may be lifted out SEE DWG BELOW 5 Clean in a non corrosive cleaning solution DO NOT USE ABRASIVES The port sleeve shoul...

Page 7: ...TM 8 STEM O RING 4 LOWER STEM PACKING COIL SLEEVE 4733 2 EA STUD SPRING YELLOW 4742 TGM 1 200 PORT SLEEVE 313 ASSY 4724 SCREEN PACKING LOWER STEM NUT ASSY PORT SLEEVE 2 EA 4733 SPRING POINTER ROD MU 5...

Page 8: ...CKING 013 MU 5A O RING SCREEN 4519 UPPER STEM 03 05 PACKING PKG 2 EACH KIT R 28 REBUILDING KIT KIT 2 28Y CHECKSTOP KIT 013 SCREEN CONTROL ASSEMBLY KIT 1 28Y PACKINGS GASKETS LOWER STEM O RING 2 EACH H...

Page 9: ...oil remove coil sleeve stud and take off thermostat group 6 Clean with a non corrosive cleaning solution DO NOT USE ABRASIVES 7 When reassembling make sure driving ball of thermostat group engages the...

Page 10: ...rial s 09 125 RF CP 152 Serial s 2 EA 03 LOWER STEM PACKING COIL SLEEVE TM 8 STUD 03 PACKING LOWER STEM 2 EA 014 CAP PACKING CAP PACKING SPRING 1529 014 O RING MU 5A O RING MU 5A NUT ASSY PORT SLEEVE...

Page 11: ...SLEEVE POINTER ROD NUT RETAINING RING POINTER SCREW W WASHER 57 M M20 3B M20 1B BRIDGE P S PACKING 2 REQ D 2 REQ D HOLDER NUT O RING M20 6B 2 REQ D M20 14B DRIVING BRIDGE ASSEMBLY M 20 1 8B POINTER ST...

Page 12: ...8 825 734 442 640 10 169 7 117 3 5 194 218 15 97 1 4 20 1120 977 1067 927 245 258 1 7 25 2 1 30 282 296 2 4 35 40 2 8 l min 1215 1283 321 339 3 1 45 3 4 50 GPM PSI BAR TM 2020A DT PARALLEL LIMITED WA...

Reviews: