background image

OPTIONAL OUTLET SETUP PIPING

(BY OTHERS)

The addition of this piping arrangement (extra 
tee and ball valve) eliminates the need to turn 
fixtures on and off throughout the building at 
setup. The flows required in the setup 
instructions (page 3) are set by using Ball Valve 
A. (make sure main outlet ball valve is closed).

MAIN OUTLET

 BALL VALVE

BALL VALVE A

10

-10

20

0

40

14

0

°F

0

60

°C

50

LEONARD

20

40

R

30

12

0

10

0

60

80

TEMPERED WATER

TO BUILDING

CAUTION! ALL THERMOSTATIC WATER MIXING VALVES AND SYSTEMS HAVE 
LIMITATIONS! THEY WILL NOT PROVIDE THE DESIRED PERFORMANCE OUTSIDE 
OF THEIR FLOW CAPACITY RANGE! CONSULT THE CAPACITY CHART BELOW 
AND OBSERVE MINIMUM FLOWS SHOWN.

FLOW CAPACITIES

MINIMUM

(l/min)

(GPM)

FLOW

2.0

8

541

454

273

371

10

98

.7

.3

72

5

1.4

.97

120 143

15

20

795

681

738

636

2.1

1.7

168

180

25

30

2.8

2.4

195

210

35

40

SYSTEM PRESSURE DROP (PSIG)

897

939

l/min

3.1

3.4

237

248

45

50

GPM

PSI

BAR

TM-1520A-DT

PARALLEL

SYSTEM PRESSURE DROP (PSIG)

MINIMUM

(l/min)

(GPM)

FLOW

2.0

8

825

734

442

640

10

169

.7

117

.3

5

194 218

15

.97

1.4

20

1120

977

1067

927

245

258

1.7

25

2.1

30

282

296

2.4

35

40

2.8

l/min

1215 1283

321

339

3.1

45

3.4

50

GPM

PSI

BAR

TM-2020A-DT

PARALLEL

LIMITED WARRANTY

Leonard Valve Company warrants the original purchaser that products manufactured by them (not by others) will 
be free from defects in materials and workmanship under normal conditions of use, when properly installed and 
maintained in accordance with Leonard Valve Company's instructions, for a period of one year from date of 
shipment. During this period the Leonard Valve Company will at its option repair or replace any product, or part 
thereof, which shall be returned, freight prepaid, to the Leonard factory and determined by Leonard to be 
defective in materials or workmanship. There are no warranties, express or implied, which extend beyond the 
description contained herein. There are no implied warranties of merchantability or of fitness for a particular 
purpose. In no event will Leonard be liable for labor or incidental or consequential damages. Any alteration or 
improper installation or use of the product will void this limited warranty.

12

Printed in USA

Summary of Contents for TM-1520A-DT

Page 1: ...tem MUST be piped according to LEONARD S REQUIRED PIPING METHOD 5 see page 4 6 Refer to page 3 of this bulletin for correct Setup Instructions 1 Type TM Parallel Systems are factory pre assembled and...

Page 2: ...STOP SCREW located on the RIGHT SIDE OF THE COVER 5 The new maximum temperature has now been set Test this temperature by holding a thermometer under the flow of water to be certain it is as desired...

Page 3: ...STOP SCREW located on the RIGHT SIDE OF THE COVER 5 The new maximum temperature has now been set Test this temperature by holding a thermometer under the flow of water to be certain it is as desired...

Page 4: ...t V1L set outlet temperature of SVR mixing valve to the same temperature as STEP 7 14 Open all outlets System is operational To balance circulation system temperature see page 5 1 The Parallel Unit MU...

Page 5: ...G VALVE 1 APPROXIMATELY HALF WAY AND START CIRCULATOR KEEP BALANCE VALVE 2 CLOSED AT THIS TIME 2 OBSERVE TEMPERATURE UNTIL IT STABILIZES 3 CLOSE BALANCING VALVE 1 SLIGHTLY IF TEMPERATURE IS TOO HOT OR...

Page 6: ...will go then screw the port sleeve nut into the base The port sleeve and thimble may be lifted out SEE DWG BELOW 5 Clean in a non corrosive cleaning solution DO NOT USE ABRASIVES The port sleeve shoul...

Page 7: ...TM 8 STEM O RING 4 LOWER STEM PACKING COIL SLEEVE 4733 2 EA STUD SPRING YELLOW 4742 TGM 1 200 PORT SLEEVE 313 ASSY 4724 SCREEN PACKING LOWER STEM NUT ASSY PORT SLEEVE 2 EA 4733 SPRING POINTER ROD MU 5...

Page 8: ...CKING 013 MU 5A O RING SCREEN 4519 UPPER STEM 03 05 PACKING PKG 2 EACH KIT R 28 REBUILDING KIT KIT 2 28Y CHECKSTOP KIT 013 SCREEN CONTROL ASSEMBLY KIT 1 28Y PACKINGS GASKETS LOWER STEM O RING 2 EACH H...

Page 9: ...oil remove coil sleeve stud and take off thermostat group 6 Clean with a non corrosive cleaning solution DO NOT USE ABRASIVES 7 When reassembling make sure driving ball of thermostat group engages the...

Page 10: ...rial s 09 125 RF CP 152 Serial s 2 EA 03 LOWER STEM PACKING COIL SLEEVE TM 8 STUD 03 PACKING LOWER STEM 2 EA 014 CAP PACKING CAP PACKING SPRING 1529 014 O RING MU 5A O RING MU 5A NUT ASSY PORT SLEEVE...

Page 11: ...SLEEVE POINTER ROD NUT RETAINING RING POINTER SCREW W WASHER 57 M M20 3B M20 1B BRIDGE P S PACKING 2 REQ D 2 REQ D HOLDER NUT O RING M20 6B 2 REQ D M20 14B DRIVING BRIDGE ASSEMBLY M 20 1 8B POINTER ST...

Page 12: ...8 825 734 442 640 10 169 7 117 3 5 194 218 15 97 1 4 20 1120 977 1067 927 245 258 1 7 25 2 1 30 282 296 2 4 35 40 2 8 l min 1215 1283 321 339 3 1 45 3 4 50 GPM PSI BAR TM 2020A DT PARALLEL LIMITED WA...

Reviews: