Mechanical installation
Attaching operating unit
3
46
EDBPM-H312 DE/EN/FR 2.0
3
Mechanical installation
3.1
Attaching operating unit
The dimensions for the mounting cutout can be found in the ”Technical data”
(
Q
45)
1. Insert operator terminal
with gasket
into
the mounting cutout.
0
1
H312_005
2. Insert mounting clamps
into the slots at the
operating unit.
0 VD
C
N.C
.
LCD
ADJ
+24
VDC
INP
UT:
18
- 32
V
5W
FUS
E
315
mA
ASP
8
N.C.
CAN+
Shield
CAN-
V-
1
2
3
4
5
2
1
3
4
2
2
H312_006
3. Tighten the screws
against the mounting
board.
0 VD
C
N.C
.
LCD
ADJ
+24
VDC
INP
UT:
18
- 32
V
5W
FUS
E
315
mA
ASP
8
N.C.
CAN+
Shield
CAN-
V-
1
2
3
4
5
2
1
3
4
3
3
H312_007