![Lenze CPC 5100 Operating Instructions Manual Download Page 48](http://html1.mh-extra.com/html/lenze/cpc-5100/cpc-5100_operating-instructions-manual_1882392048.webp)
Technical data
Electrical data
Mainboard
3
l
48
LDCDS−CPC5100 DE/EN 1.1
3.2
Electrical data
3.2.1
Mainboard
)
Note!
For information on the mainboard please see the separate documentation for
the mainboard on the manual CD.
The type of the mainboard used is specified in the device pass card for your
IPC.
3.2.2
Power supply unit
)
Note!
For information on the power supply unit please see the separate
documentation for the power supply unit on the manual CD.
The type of the power supply unit used is specified in the device pass card for
your IPC.
Battery pack of the optional UPS power supply unit
Rated voltage
24 V DC
Rated power
100 VA
Rated capacity
2.0 Ah
Fuse
20 A
ATO
â
fuse (blade contact)
Buffer time
Max. 3 ... 10 min
According to the PC equipment
Charging time
For initial
commissioning
24 h
Afterwards
Max. 10 ... 15 h