Attention:
• Read “Installation guidelines” on page 92 to ensure that you work safely.
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding system.
A video for this task is available at:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DY1RaWHYM4xDloAwuBQHR0
• Youku:
http://list.youku.com/albumlist/show/id_52339628
Procedure
Step 1. Touch the static-protective package that contains the hot-swap power supply to any unpainted
surface on the outside of the server. Then, take the hot-swap power supply out of the package and
place it on a static-protective surface.
Step 2. If there is a power-supply filler installed, remove it.
Figure 75. Hot-swap power supply filler removal
Step 3. Slide the new hot-swap power supply into the bay until it snaps into position.
156
ThinkSystem SR645 Setup Guide
Summary of Contents for ThinkSystem SR645
Page 1: ...ThinkSystem SR645 Setup Guide Machine Types 7D2X and 7D2Y ...
Page 51: ...Figure 9 Server components Chapter 2 Server components 47 ...
Page 83: ...Chapter 3 Internal cable routing 79 ...
Page 88: ...Figure 27 Cable routing for configuration 2 84 ThinkSystem SR645 Setup Guide ...
Page 94: ...90 ThinkSystem SR645 Setup Guide ...
Page 118: ...Figure 38 Performance heat sink installation 114 ThinkSystem SR645 Setup Guide ...
Page 172: ...168 ThinkSystem SR645 Setup Guide ...
Page 185: ...W working inside the server power on 94 Copyright Lenovo 2020 181 ...
Page 186: ...182 ThinkSystem SR645 Setup Guide ...
Page 187: ......
Page 188: ......