![Lenovo ThinkSystem SR645 Setup Manual Download Page 112](http://html.mh-extra.com/html/lenovo/thinksystem-sr645/thinksystem-sr645_setup-manual_203229112.webp)
Step 2. Remove the top cover.
Attention:
Handle the top cover carefully. Dropping the top cover with the cover latch open might
damage the cover latch.
Figure 34. Top cover removal
a. Use a screwdriver to turn the cover lock to the unlocked position as shown.
b. Press the release button on the cover latch and then fully open the cover latch.
c. Slide the top cover to the rear until it is disengaged from the chassis. Then, lift the top cover off
the chassis and place the top cover on a flat clean surface.
After you finish
Install any options you want to install.
108
ThinkSystem SR645 Setup Guide
Summary of Contents for ThinkSystem SR645
Page 1: ...ThinkSystem SR645 Setup Guide Machine Types 7D2X and 7D2Y ...
Page 51: ...Figure 9 Server components Chapter 2 Server components 47 ...
Page 83: ...Chapter 3 Internal cable routing 79 ...
Page 88: ...Figure 27 Cable routing for configuration 2 84 ThinkSystem SR645 Setup Guide ...
Page 94: ...90 ThinkSystem SR645 Setup Guide ...
Page 118: ...Figure 38 Performance heat sink installation 114 ThinkSystem SR645 Setup Guide ...
Page 172: ...168 ThinkSystem SR645 Setup Guide ...
Page 185: ...W working inside the server power on 94 Copyright Lenovo 2020 181 ...
Page 186: ...182 ThinkSystem SR645 Setup Guide ...
Page 187: ......
Page 188: ......