© Copyright Lenovo 2020
Chapter 4: Removing and Replacing Components
57
Removing and Replacing a Power Supply Module
The rear panel of the NE2580O has two bays for hot-swap power supply modules.
Two active power supply modules are required for load-sharing and redundancy. If
one power supply module fails, you can replace it without powering off the switch
or disrupting switch functions.
For proper airflow when operating the switch with only one power supply module,
the empty power supply bay must be closed by a blank power filler plate.
Summary of Contents for ThinkSystem NE2580O RackSwitch
Page 1: ...Lenovo ThinkSystem NE2580O RackSwitch Installation Guide For Network Operating System ...
Page 6: ...6 Lenovo NE2580O Installation Guide ...
Page 14: ...14 NE2580O Installation Guide ...
Page 54: ...54 NE2580O Installation Guide ...
Page 70: ...70 NE2580O Installation Guide ...
Page 88: ...88 NE2580O Installation Guide ...