© Copyright Lenovo 2020
Chapter 2: Switch Components
21
USB 2.0 Port
The USB 2.0 port enables you to connect a USB drive to the switch. You can copy
files from the switch to the USB drive, or from the USB drive to the switch. You can
also start the switch using files on the USB drive.
Figure 8.
USB 2.0 port
The supported file system formats for USB drives are FAT32 and NTFS (read-only).
Service LEDs
The service LEDs are located on the front side of the switch, as part of the
management panel. They indicated the status of various switch hardware
components.
Figure 9.
NE2580O Front Side Panel Service LEDs
The status LEDs for the front panel are described in the following table:
Table 3.
Front side panel status LEDs behavior
LED
State
Functional Meaning
Service Required
Steady blue
Stack backup/member, or
Operations command
Flashing blue
Single power supply failure, or
AC cable unplugged from a PSU, or
Fan failure, or
Stack error
Light off
Power supply normal operation, or
Fans normal operation, or
Stack master, or
Non-stack member, or
AC cables unplugged or damaged on
all PSUs
Service Required Status
Power Supply Status
Fan Status
Stacking Status
Summary of Contents for ThinkSystem NE2580O RackSwitch
Page 1: ...Lenovo ThinkSystem NE2580O RackSwitch Installation Guide For Network Operating System ...
Page 6: ...6 Lenovo NE2580O Installation Guide ...
Page 14: ...14 NE2580O Installation Guide ...
Page 54: ...54 NE2580O Installation Guide ...
Page 70: ...70 NE2580O Installation Guide ...
Page 88: ...88 NE2580O Installation Guide ...