© Copyright Lenovo 2017
Chapter 3: Installing G8264 Hardware and Options
39
4.
Secure
the
switch
unit
to
the
rack
posts
with
M6
screws
(Item
3),
washers
(Item 6),
and
either
clip
nuts
(Item
4)
or
cage
nuts
(Item
5).
Torque
the
screws
to
approximately
5.7
Nm
±
0.1
Nm
(50
inch
‐
pounds).
5.
If
installing
the
1U
air
‐
duct
option,
see
the
instruction
on
6.
Connect
all
external
cables
in
accordance
with
the
7.
Initialize
the
switch.
See
on
.
8.
If
the
switch
is
a
replacement
unit,
set
Vital
Product
Data
(see
).
Installing the G8264 in a Lenovo System x or Power Rack
This
section
describes
how
to
install
the
G8264
in
a
Lenovo
System
x
®
or
Power
4
‐
post
rack,
using
the
Lenovo
Adjustable
19”
4
‐
Post
Rail
Kit.
This
kit
must
be
purchased
separately.
It
includes
the
following
parts:
6
3
4
Table 11.
Lenovo Adjustable 19” 4-Post Rail Kit parts
Item number
Description
Quantity
1
Switch
front
bracket
2
2
M4
screws
16
3
M6
screws
8
4
M6
clip
nuts
8
5
M6
cage
nuts
8
6
M3.5
screws
4
7
Rear
mounting
bracket
1
8
Rear
mounting
bracket
with
cord
exit
1
9
Filler
plate
1
10
M6
locking
washers
8
Summary of Contents for RackSwitch G8264
Page 1: ...Lenovo RackSwitch G8264 Installation Guide ...
Page 6: ...6 G8264 Installation Guide ...
Page 18: ...18 G8264 Installation Guide ...
Page 56: ...56 G8264 Installation Guide ...
Page 60: ...60 G8264 Installation Guide Replacing the Power Supply Module Statement 31 ...
Page 74: ...74 G8264 Installation Guide ...
Page 80: ...80 G8264 Installation Guide ...
Page 86: ...86 G8264 Installation Guide ...
Page 100: ...100 G8264 Installation Guide ...
Page 106: ...106 G8264 Installation Guide ...