Installing the Air-Duct Option
The
G8264
supports
an
optional
1U
air
duct
to
maximize
air
flow
conditions
in
a
19”
rack.
For
information
on
removing
an
installed
1U
air
‐
duct
option,
see
The
following
table
lists
the
parts
included
with
the
air
‐
duct
option
kit.
Attention:
The rack-mounting frame may not be able to support the weight of the
networking switch with only the front post mounting brackets (2-post application). If
the switch has an undesirable amount of sag, it is recommended to use a 4-post
mounting kit.
Attention:
For earthquake stability, mount the switch in a 4-post rack.
Table 13.
Air-duct Option Kit parts
Item Number
Description
Quantity
1
Cable
tie
4
2
1U
Duct
sleeve
(long)
1
3
Mounting
bracket
(left)
1
4
Mounting
bracket
(right)
1
5
Foam
carrier
assembly
2
6
M3.5
screws
6
1
6
5
Summary of Contents for RackSwitch G8264
Page 1: ...Lenovo RackSwitch G8264 Installation Guide ...
Page 6: ...6 G8264 Installation Guide ...
Page 18: ...18 G8264 Installation Guide ...
Page 56: ...56 G8264 Installation Guide ...
Page 60: ...60 G8264 Installation Guide Replacing the Power Supply Module Statement 31 ...
Page 74: ...74 G8264 Installation Guide ...
Page 80: ...80 G8264 Installation Guide ...
Page 86: ...86 G8264 Installation Guide ...
Page 100: ...100 G8264 Installation Guide ...
Page 106: ...106 G8264 Installation Guide ...