Page 32
START-UP REPORT
Job Name:___________________________________
Store No.___________Start-Up Date:______________
Address:_____________________________________
City:______________________________State:______
Start-Up Contractor:____________________________
Technician:___________________________________
Model No.:___________________________________
Serial No.:____________________________________
RTU No.:________ Catalog No.:__________________
Inspections and Checks
Damage?
Yes
No
R410A
If yes, reported to:____________________________
Verify factory and field-installed accessories.
Check electrical connections. Tighten if necessary.
Supply voltage: L1-L2______L1-L3_____L2-L3_____
If unit contains a 208-230/240 volt transformer:
Check primary transformer tap
Transformer secondary voltage: __________
Cooling Checks
Compressor Rotation
Ambient Temp.________Return Air Temp.________ Supply Air Temp.________
Compr. Amps
Compressor Volts
Pressures
CC Heater Amps
L1
L2
L3
L1-L2
L1-L3
L2-L3
Disch.
Suct.
L1
1
2
Water-To-Refrigerant Coil Checks
Fluid type:Water and Propylene Glycol
Water and Ethylene Glycol
Water and Methanol
__________%
Stage 1 Pressure Differential
Stage 2 Pressure Differential
Water Inlet Temperature
Water Outlet Temperature
Water Temperature Differential
Strainer cleaner installed?
Blower Checks
Pulley/Belt Alignment
Set Screws Tight
Blower Rotation
Belt Tension
Nameplate Amps:_________
Volts:_______________
Motor
Amps
L1_________
L2_________
L3_________
Volts
L1-L2_____________
L1-L3_____________
L2-L3_____________
Control Type
Accessory Checks
Power Exhaust Amps
1 _____________ 2 ____________ None
Economizer Operation
Min. Pos.
Motor travel full open/close
Notes:_______________________________________________________________________________________
____________________________________________________________________________________________