Page 19
6− Brush out and vacuum the vent outlet area of the outer
drum and replace vent pipe.
7− Clean around burner, blower deck and vestibule area.
NOTE − A heat exchanger clean-out kit ABRSH380
(35K09) is available from Lennox.
OHR23 Start−Up & Performance Check List
Job Location
Oil Pump Pressure [recommended minimum 140 psi]
Filter Clean & Secure?
Supply Voltage
Electrical Connections Tight?
Job Name
Installer
Unit Model No.
Job No.
City
City
Serial No.
Date
State
Serviceman
Draft Reading (recommended .03−.04 inches w.c.)
Flue Connections Tight?
HEATING SECTION
THERMOSTAT
Calibrated?
Heat Anticipator Properly Set?
Level?
Blower Motor Amps
Blower Motor H.P.
Blower Motor Lubrication O.K.?
Piping Connections Tight?
Vent Clear?
State
Temperature Rise
Fan Control Cutout
Fan Control Setting (maximum 130
F 55
C)
Burner Model No.
Serial Number
All Valves Open?
PROPER DRAFT
% CO
2
(recommended 12%)