Start−Up and Performance Check List
Job Name
Job no.
Date
Job Location
City
State
Installer
City
State
Unit Model No.
Serial No.
Service Technician
Nameplate Voltage
Rated Load Ampacity
Compressor Amperage: 1st Stage
2nd Stage:
Maximum Fuse or Circuit Breaker
Electrical Connections Tight?
Indoor Filter clean?
Supply Voltage (Unit Off)
Indoor Blower RPM
S.P. Drop Over Indoor (Dry)
Outdoor Coil Entering Air Temp.
COOLING (2ND STAGE)
Liquid Line Pressure:
Vapor Pressure:
Refrigerant Charge Checked?
HEATING (2ND STAGE)
Liquid Line Pressure:
Vapor Pressure:
Refrigerant Charge Checked?
Vapor Pressure; 1st Stage:
2nd Stage:
Refrigerant Lines:
Leak Checked?
Properly Insulated?
Outdoor Fan Checked?
Service Valves:
Fully Opened?
Caps Tight?
Voltage With Compressor Operating
SEQUENCE OF OPERATION
THERMOSTAT
Heating Correct
?
Cooling Correct?
Calibrated?
Properly Set?
Level?