It is advisable to unpack the unit at the place where the unit is going to be installed, to avoid damages during
manage.
The unit must be transported in a HORIZONTAL POSITION on its metal bedplate profiles . Any other position may
cause serious damage to the machine.
When the unit is received, it should be checked to assure that there are no bumps or other damage, following the
instructions on the packaging. If there is damage, the unit may be rejected by notifying the LENNOX Distribution
Department and reporting why the machine is unacceptable on the transport agents delivery notice. Any later
complaint or claim made to the LENNOX Distribution Department, for this type of anomaly, cannot be considered
under the Guarantee.
Sufficient space must be allowed to facilitate placement of the unit. The unit may be mounted outdoors. There
should be adequate drainage around the unit.
All INSTALLATION, SERVICE and MAINTENANCE operations
must be carried out by QUALIFIED PERSONNEL.
When positioning the unit, be sure that the Rating Plate will always be visible since this
data will be necessary to assure proper maintenance.
If unloading and placement requires the use of a crane, then secure the suspension cables as shown in the figure.
The unit can only be lifted and moved by its base.
How to hoist the unit
In heat pump units during defrost cycle, the units produce a great amount of water melting the ice off coils.
If you wish to drain the water, adequate drainage should be installed behind the unit to collect and carry out the water
where desired.
set
mode
on off
set
mode
on off
set
mode
on of
f
Use
separators
Use
separators
2.1.- SITE AND SHIPPING GUIDANCE
2.- INSTALLATION
2.2.- UNIT LIFTING