506550-01
Page 55 of 66
Issue 1230
18. Remove screws along vestibule sides and bottom which
secure vestibule panel and heat exchanger assembly
to cabinet. Remove two screws from blower rail which
secure bottom heat exchanger flange. Remove heat
exchanger from furnace cabinet.
19. Back wash heat exchanger with soapy water solution or
steam. If steam is used it must be below 275°F (135°C).
20. Thoroughly rinse and drain the heat exchanger. Soap
solutions can be corrosive. Take care to rinse entire
assembly.
21. Reinstall heat exchanger into cabinet making sure that
the clamshells of the heat exchanger assembly are
resting on the support located at the rear of the cabinet.
Remove the indoor blower to view this area through the
blower opening.
22. Re-secure the supporting screws along the vestibule
sides and bottom to the cabinet.
23. Reinstall cabinet screws on front flange at blower deck.
24. Reinstall the primary limit on the vestibule panel.
25. Route heating component wiring through hole in blower
deck and reinsert strain relief bushing.
26. Reinstall electrical junction box.
27. Reinstall the combustion air inducer. Reconnect the 4
pin plug to the wire harness.
28. Reinstall pressure switches and reconnect pressure
switch wiring.
29. Carefully connect combustion air pressure switch hosing
from pressure switches to proper stubs on cold end
header collector box.
30. Reconnect condensate drain line to the cold end header
box.
31. Use securing screws to reinstall flue collar to the top
cap on the furnace. Reconnect exhaust piping and
exhaust drain tubing.
32. Replace flexible exhaust adapter on combustion air
inducer and flue collar. Secure using two existing hose
clamps.
33. Reinstall burner box assembly in vestibule area.
34. Reconnect flame roll-out switch wires.
35. Reconnect sensor wire and reconnect 2 pin plug from
ignitor.
36. Secure burner box assembly to vestibule panel using
four existing screws. Make sure burners line up in center
of burner ports.
37. Reinstall gas valve manifold assembly. Reconnect gas
supply line to gas valve.
38. Reinstall burner box cover.
39. Reconnect 2 pin plug to gas valve.
40. Replace the blower compartment access panel.
41. Refer to instruction on verifying gas and electrical
connections when re-establishing supplies.
42. Follow lighting instructions to light and operate furnace
for 5 minutes to ensure that heat exchanger is clean
and dry and that furnace is operating properly.
43. Replace heating compartment access panel.
Cleaning the Burner Assembly
1.
Turn off electrical and gas power supplies to furnace.
Remove upper and lower furnace access panels.
2.
Disconnect the 2 pin plug from the gas valve.
3.
Remove the burner box cover.
4.
Disconnect the gas supply line from the gas valve.
Remove gas valve/manifold assembly.
5.
Mark and disconnect sensor wire from the sensor.
Disconnect wires from flame rollout switches.
6.
Remove four screws which secure burner box assembly
to vest panel. Remove burner box from the unit.
7.
Use the soft brush attachment on a vacuum cleaner to
gently clean the face of the burners. Visually inspect
the inside of the burners and crossovers for any blockage
caused by foreign matter. Remove any blockage.
8.
Reinstall the burner box assembly using the existing four
screws. Make sure that the burners line up in the center
of the burner ports.
9.
Reconnect the sensor wire and reconnect the 2 pin plug
to the ignitor wiring harness. Reconnect wires to flame
rollout switches.
10. Reinstall the gas valve manifold assembly. Reconnect
the gas supply line to the gas valve. Reinstall the burner
box cover.
11. Reconnect 2 pin plug to gas valve.
12. Replace the blower compartment access panel.
13. Refer to instruction on verifying gas and electrical
connections when re-establishing supplies.
14. Follow lighting instructions to light and operate furnace
for 5 minutes to ensure that heat exchanger is clean
and dry and that furnace is operating properly.
15. Replace heating compartment access panel.
Summary of Contents for Allied Air A96UHMV
Page 3: ...506550 01 Page 3 of 66 Issue 1230 A96UHMV Exploded View Figure 1...
Page 16: ...506550 01 Page 16 of 66 Issue 1230 Table 5 MAXIMUM ALLOWABLE VENT LENGTH feet...
Page 30: ...506550 01 Page 30 of 66 Issue 1230 Low Voltage Field Wiring Table 11 R required on some units...
Page 31: ...506550 01 Page 31 of 66 Issue 1230 Low Voltage Field Wiring Table 11 R required on some units...
Page 32: ...506550 01 Page 32 of 66 Issue 1230 Low Voltage Field Wiring Table 11 2 Stage Single Stage...
Page 33: ...506550 01 Page 33 of 66 Issue 1230 TYPICAL WIRING DIAGRAM Figure 40...
Page 34: ...506550 01 Page 34 of 66 Issue 1230 Integrated Control Figure 41...
Page 38: ...506550 01 Page 38 of 66 Issue 1230 BLOWER DATA...
Page 39: ...506550 01 Page 39 of 66 Issue 1230 BLOWER DATA...
Page 40: ...506550 01 Page 40 of 66 Issue 1230 BLOWER DATA...
Page 41: ...506550 01 Page 41 of 66 Issue 1230 BLOWER DATA...
Page 42: ...506550 01 Page 42 of 66 Issue 1230 BLOWER DATA...
Page 43: ...506550 01 Page 43 of 66 Issue 1230 BLOWER DATA...
Page 44: ...506550 01 Page 44 of 66 Issue 1230 BLOWER DATA...
Page 45: ...506550 01 Page 45 of 66 Issue 1230 BLOWER DATA...
Page 46: ...506550 01 Page 46 of 66 Issue 1230 BLOWER DATA...
Page 58: ...506550 01 Page 58 of 66 Issue 1230 Configuring Unit Size Codes...