
Coupling and uncoupling implement
46
The position of the top link also presets the pressure on the rollers
and therefore the degree of tilling and recompacting of the soil.
See also the section entitled “Pressure load of the rollers”.
Secure the top link pin (7) using the linch
pin.
If the route to the field is via public highways, there must be a
lighting system on the implement.
Before retracting the side sections, lift
out the device all the way.
Retract the side sections.
Rubin – folding
Attach the protective device if the route
to the field is via public highways.
Rubin – rigid
Retract the folding outer hollow discs.
7
Summary of Contents for Rubin 9 U + K U
Page 2: ......