
11. Move the wrapping table to the top position until it stops,
while the film is cut and the bale is unloaded to the ground.
hold up
12. Move the wrapping table to the bottom position.
When the wrapping table has reached the bottom position, it
turns automatically to the loading position to receive the next
bale.
down
1. Loading arm (including bale stop)
Figure 20. Load bale on loading arm to bale stop
Operation
3-23
W-H003.1403EN
Summary of Contents for Attis PT 130
Page 1: ...Lely Attis PT 130 Operator Manual W H003 1403EN English Original...
Page 2: ...ii...
Page 4: ...2 Trademarks copyright and disclaimer W H003 1403EN...
Page 8: ...4 Preface W H003 1403EN...
Page 20: ...1 10 Introduction W H003 1403EN...
Page 25: ...2 5 Position of the decals Figure 10 Positions of decals Safety 2 5 W H003 1403EN...
Page 27: ...hold 6 Next instruction 7 Last instruction Up Safety 2 7 W H003 1403EN...
Page 28: ...2 8 Safety W H003 1403EN...
Page 52: ...Figure 21 Unload and tip a bale on its end 3 24 Operation W H003 1403EN...
Page 53: ...Figure 22 Unload a bale Operation 3 25 W H003 1403EN...
Page 68: ...4 10 Operation adjustments W H003 1403EN...
Page 80: ...5 12 Maintenance W H003 1403EN...
Page 82: ...6 2 Troubleshooting W H003 1403EN...
Page 84: ...7 2 Hydraulic diagram 7 2 Diagrams and tables W H003 1403EN...
Page 90: ...8 2 Specifications W H003 1403EN...