9
Extended guide
waiting time is over, the pilot light (4) will start flashing. Lift the group lever (14)
completely (Pic 6.3). The brewing group (13) will start dispensing water (within
30 seconds). Let the water come out for about 30 seconds and then return the
group lever to its initial position.
Note. The lever installed on the group has two functioning positions: either
fully lifted or fully lowered. There are not intermediate positions that guarantee
an optimal performance during coffee brewing.
Attention. Please remember to fully lower the lever to avoid water leaking
from the group.
Now the hydraulic circuit is filled up. The machine will start heating the water to
reach the pre-set values. This operation requires maximum 24 minutes: the pilot
light (5) remains firmly on, while the pilot light (4) flashes.
The machine is ready for use when the 2 pilot lights (4, 5) and the lighted frame
of the ON/OFF (8) switch are firmly on.
Attention. During the heating phase, a small quantity of water will drain in
the drip tray (17). This is normal and confirms the machine correct functioning
(functions check).
Attention. MaraX has the drains into the drip tray. Check the drip tray,
empty, and rinse it periodically!
7. How to install the water softener filter
7.1
7.2
7.3
1
2
min
3
Before installing water softener filter (H) in the water tank (10), immerse the
water softener filter in a jug full of water for about 3 minutes, to eliminate the air
inside the filter that may cause a machine malfunction (Pic 7.1).