17
• Before putting into operation, check
power supply cord (1)
and connector as well as extension cable for electrical
and mechanical damage.
• Move
lower guide bar (15)
into the required position using
clamping screw, lower guide bar (17)
and
upper guide bar (33)
using
clamping lever, upper guide bar (16)
.
• Clip strain relief of
power supply cord (1)
in
holder (18)
.
• Check the basic setting of the
welding nozzle (7)
.
– The
welding nozzle (7)
must lie flat on the lower membrane liners (see Detail A).
– The distance between the centre of the
drive roller (13)
and the air outlet of the
welding nozzle (7)
should be 80 mm (see Detail B). Otherwise the
hot air blower (8)
must be set with the
scale for tool
adjustment (12)
by loosening the
screws (24)
.
– The
welding nozzle (7)
should be set parallel with the
drive roller (13
• Transport configuration
– Swivel the
guide roller (19)
upwards
– Extend the
hot air blower (8)
by pulling the
locking lever (10)
and swivelling it up until it locks in place.
• Set the
guide roller (19)
to the required overlap using the
guide roller adjusting screw (20)
.
• The distance between
Guide roller (19)
and
Drive roller (13)
is 5 mm (Detail C).
Operating preparation
13
7
7
13
19
20
Detail A
Detail B
Detail C
17
15
16
1
8
12
19
20
7
13
24
18
33
10