OMEGA
Installation Manual
Edition July 2013
Omega
platform lift
page 3 of 46
Observe the following points before installation!
Installation teams must have a general knowledge in
basic mechanical engineering and providing adequate fixation of the rails and pillars
reading and understanding circuit diagrams and wiring schematics.
In order to save time and energy, it is wise to be properly prepared before installing the
OMEGA-platform lift. The following points will assist in completing the installation efficiently
and on schedule:
Have a
complete electrical and mechanical tool kit on hand
.
Check beforehand what fixing materials (screws, anchor bolts, adhesives) are
required for the proper fixing of the rails to the wall or the pillars to the floor. These
materials are not included in the delivery! The installation company is responsible for
the fixing of the rail to the wall or the pillars to the floor/steps!
Have the correct on-site power supply set up using the correct fuses. The power
supply has to be connected to the motor box at the upper end of the rail.
Assemble a team of 2 technicians to mount the plant
.
Check the packages for shipping damage
and missing parts before bringing the
lift to the site.
Open the installation package (which is in the box of the OMEGA lift). Review the
enclosed Installation notes, if supplied. In some cases, additional components must
be brought to the site.
Refer to the tube layout drawing and familiarise yourself with the tube configuration.
The following tools will be required to finish the installation successfully:
A complete toolset for
mechanical and electrical works
Voltmeter
Drilling machines
Drills, thread cutter
Fixing material
Water lever with angle
indication