background image

5

RESOURCES

The following instructional tools are available:  

1.  Wiring loads and accessories: LP Series Installation & Wiring Reference (included with 

the panel): Detailed LP8 wiring instructions for relays/contactors and loads, as well as low 

voltage controls wiring and Group Switch card smartwiring procedures.

2.  Low voltage control device installation instructions: Provided in the box with optional 

products.

3.  LP8 Programming: LP Series User Guide (included with the panel).
4.  Instructions for individual clock screens:  

Press the HELP button on the panel’s clock keypad.

5.  Keeping records of circuit and relay schedules and programming selections: LP8 

Programming Record Sheet (included with the panel).

6.  Technical support: Visit our website – see the downloads page for new materials, FAQ 

area, or call 800.879.8585.

HELP

SELECT

RAISE

LOWER

afte
r

before

On/ 

Of

f/

Open:_______ 

thru:_______

On/ 

Of

f/

Open:_______ 

thru:_______

Blink before of

f?  

 

No   
Ye

s

Time Delay/Sweep Interval: _____min.

On   _____  min. 

Sunset

afte
r

before

On/ 

Of

f/

Open:_______ 

thru:_______

On/ 

Of

f/

Open:_______ 

thru:_______

afte
r

before

On/ 

Of

f/

Open:_______ 

thru:_______

On/ 

Of

f/

Open:_______ 

thru:_______

afte
r

before

afte
r

before

On/ 

Of

f/

Open:_______ 

thru:_______

On/ 

Of

f/

Open:_______ 

thru:_______

afte
r

before

Photo & Sched On/O

ff

Astronomic On/O

ff

Astro & Sched On/O

ff

Manual On/Sched Of

f

Scheduled On/O

ff

Man On/AS Sweep Of

f

Photocell On/O

ff

Photo & Sched On/O

ff

Astronomic On/O

ff

Astro & Sched On/O

ff

Manual On/Sched Of

f

Scheduled On/O

ff

Man On/AS Sweep Of

f

Photocell On/O

ff

Photo & Sched On/O

ff

Astronomic On/O

ff

Astro & Sched On/O

ff

Manual On/Sched Of

f

Scheduled On/O

ff

Man On/AS Sweep Of

f

Photocell On/O

ff

Photo & Sched On/O

ff

Astronomic On/O

ff

Astro & Sched On/O

ff

Manual On/Sched Of

f

Scheduled On/O

ff

Man On/AS Sweep Of

f

Photocell On/O

ff

Photo & Sched On/O

ff

Astronomic On/O

ff

Astro & Sched On/O

ff

1

2

3

4

5

Summary of Contents for Wattstopper LP8

Page 1: ... provided 4 Note the entry areas for low and line voltage in the picture Install conduit into the designated areas of the enclosure 5 Reinstall the panel interior using the original hardware 6 Connect the power supply lower left corner to the line voltage power source Note the allowable voltages printed on the unit 7 Note the entry areas for low and line voltage in the picture below Install condui...

Page 2: ...o black plastic self retained pop fasteners Pull to release Press to latch Ground Neutral Line A B C D E F G H Power supply ACC POWER 24VDC 24VR 24VAC WHITE YELCOM 24VR 24VAC WHITE RELAY PILOT Relay status LEDs 8 Relay control push buttons 8 The exterior panel cover is hinged in the center the low voltage side is latched for easy access the line voltage side is screwed down for safety Inside the p...

Page 3: ... Solid Green 4 Power LEDs 2 Solid Green Solid Green 2 Blinking Blue 1 Relay Driver RD boards 2 Flashing Blue at DS6 Power Supply PS board C8 motherboard Blinking Amber on RD board at DS7 trouble condition Flashing Blue LEDs 2 normal operation Group Switch Card optional Blinking Amber LEDs 2 trouble condition POWER UP AND TEST 1 Power up the panel 2 Complete the tests in the table 3 Upon completing...

Page 4: ...een Power LEDs at DS1 DS2 on the PS board Both green Power LEDs are continuously lit Pass Go to next Test Either Green Power LED is off Fail Turn off power to panel and check red and black wire connections to the J2 terminal block on the PS board Reset panel power Check LEDs again 5 Look for any lit Amber LEDs on the RD and GS if installed No Amber LEDs observed Pass Go to next Test An Amber LED i...

Page 5: ...n _______ thru _______ On Off Open _______ thru _______ Blink before off No Yes Time Delay Sweep Interval _____min On _____ min Sunset after before On Off Open _______ thru _______ On Off Open _______ thru _______ after before On Off Open _______ thru _______ On Off Open _______ thru _______ after before after before On Off Open _______ thru _______ On Off Open _______ thru _______ after before c ...

Page 6: ...ATION Wattstopper warranties its products to be free of defects in materials and workmanship for a period of five 5 years There are no obligations or liabilities on the part of Wattstopper for consequential damages arising out of or in connection with the use or performance of this product or other indirect damages with respect to loss of property revenue or profit or cost of removal installation ...

Reviews: