14
Figure.4.2-1
Figure.4.2-4
10-30kVA : 500 (for maintenance and internal battery installation)
40-60kVA : 700 (for maintenance and internal battery installation)
700
500
250
A (mm)
B (mm)
D (mm)
C (mm)
Figure.4.2-2
Figure.4.2-3
Climatization
ROOM LAYOUT RECOMMENDATION TABLE
Ventilation
Direction of ventilation is front/sides to back.
The room should be equipped with ventilation system or air conditioning to collect warm air
from the top of the room and provide cool air at the bottom.
Summary of Contents for KEOR T
Page 1: ...KEOR T Installation Manual LE07544AA ...
Page 2: ...2 KEOR T ENGLISH 6 EN ...
Page 5: ...5 KEOR T Installation Manual Battery Fast Fuses Installation Operating Manuals ...
Page 32: ...32 Figure 5 3 1 4 1 Keor T 10 30kVA 1x60pcs 7 9Ah BATTERY WIRING DIAGRAM ...
Page 34: ...34 Figure 5 3 1 4 3 Keor T 40 60kVA 2x60pcs 7 9Ah BATTERY WIRING DIAGRAM ...
Page 50: ...50 SEPARATED RECTIFIER AND BYPASS INPUTS ...
Page 51: ...51 KEOR T Installation Manual COMMON RECTIFIER AND BYPASS INPUTS ...