6
3 Installation
1
Inspection
The following items are inside the box:
• UPS unit
• User Manual
• Safety Instructions
• USB cable (only for 1000-1500-2000 VA models)
2
Connect to Utility Power
Connect AC power cord to utility power. The UPS will start charging the battery. For the best result,
charge the battery for 6 hours prior to initial use.
600VA/800VA
1000VA
1500VA/2000VA
The drawings are only indicative. The sockets standard/configuration changes according to the model part number.