background image

This product may be covered by patents found at www.kenall.com/patents. Content of specification sheets is subject to change; please consult www.kenall.com for current product details. 

© 2018 Kenall Mfg. Co. All rights reserved.

 www.kenall.com         P: 800-4-Kenall         F: 262-891-9701         10200 55th Street Kenosha, Wisconsin 53144    

3

INSTALLATION INSTRUCTIONS

F-5419

8.  Attach the sign panel by compressing the torsion 

springs and inserting them into the slots on the 
electrical gear plate.

9.  Check installation by gently pulling on housing and 

canopy to ensure it is securely held in place.

10. Energize AC supply, LED display will illuminate.
11. When provided with battery, charge battery for 24 

hrs. prior to building occupancy.

II.  RECESSED CEILING MOUNT

1.  De-energize the circuit where the exit sign / exit 

light will be installed.

2.  Extend unswitched 24 hour AC supply of rated 

voltage to junction box that will be used for 
connection of equipment.

3.  Install recessed housing above ceiling line and 

secure using supplied hanger bars or by other 
means, as deemed appropriate.  Connect conduit to 
supply access plate provided on recessed housing.

4.  Route the wires into the electrical compartment.
5.  Connect power supply accordance with local codes. 

Wire connections as follows: line to Black lead; 
Neutral to White lead. Connect green grounding 
lead to supply grounding conductor.  

6.  When installing exit light (provided with battery 

for emergency operation) connect battery leads to 
terminals identified on driver board.  Connect red 
lead to terminal (positive) and black lead 
to terminal marked – (negative).

7.  Install electrical gear into housing and secure with 

attachment screws.

Summary of Contents for Kenall CAE Series

Page 1: ...THE HAZARDS INVOLVED DISCONNECT POWER TO ALL CIRCUITS BEFORE WIRING FIXTURE INSTALL IN ACCORDANCE WITH ALL NATIONAL STATE AND LOCAL CODES DO NOT CONNECT TO AN UNGROUNDED SUPPLY READ ALL FIXTURE MARKINGS AND LABELS TO ENSURE CORRECT INSTALLATION OF FIXTURE SUPPLEMENTAL INSTRUCTIONS MAY BE LOCATED ON THE FIXTURE IN ADDITION TO THIS INSTRUCTION SHEET REGARDING ORIENTATION OR MOUNTING RESTRICTIONS SAV...

Page 2: ...voltage from the junction box of sufficient length to allow for routing into electrical housing 3 Route wires through the center hole of mounting plate and securely fasten the mounting plate to the J box with screws 4 Remove center knock out of electrical housing for attachment of mounting stem Attach opposite end of stem to canopy 5 Route the wires through the canopy pendant and mount the canopy ...

Page 3: ...G MOUNT 1 De energize the circuit where the exit sign exit light will be installed 2 Extend unswitched 24 hour AC supply of rated voltage to junction box that will be used for connection of equipment 3 Install recessed housing above ceiling line and secure using supplied hanger bars or by other means as deemed appropriate Connect conduit to supply access plate provided on recessed housing 4 Route ...

Page 4: ... current product details 2018 Kenall Mfg Co All rights reserved www kenall com P 800 4 Kenall F 262 891 9701 10200 55th Street Kenosha Wisconsin 53144 4 INSTALLATION INSTRUCTIONS F 5419 For technical assistance call 1 800 4KENALL 1 800 453 6255 WARRANTY CUSTOMER SERVICE For warranty information visit www kenall com Resources Certified Performance Warranties ...

Reviews: