LF49/50/55UxP, LF49/50/55UxP-B2B
Installation Instructions
10
TOOLS REQUIRED FOR INSTALLATION
PARTS
3/8"
#2
1/2"
5/16"
BA (4/8)
M4 x 12mm
BD (4/8)
BG (4/8)
M6 x 12mm
BJ (4/8)
M8 x 12mm
BB (4/8)
M4 x 25mm
BC (4/8)
M4 x 50mm
BE (4/8)
M5 x 25mm
BF (4/8)
M5 x 50mm
BH (4/8)
M6 x 25mm
B
I
(4/8)
M6 x 50mm
BK (4/8)
M8 x 25mm
BL (4/8)
M8 x 50mm
BM (8/16)
.750x.344x.500"
BO (4/8)
[universal washer]
BN (8/16)
.750x.323x.250"
OR
A (1)
LFxxUxP
[LF49UxP shown
as example]
A (1)
LFxxUxP-B2B
[LF49UxP-B2B
shown as example]
OR
C (1)
[Storage panel]
D (2/4 rolls)
Gasket strip,
1/2" wide
Monitor Interface Hardware Bag
E (4/4)
3/8" x 3"
F (2/2)
10-24 x 3/16"
G (3/6)
[Cable tie mount]
H (6/12)
[Cable tie, 7-1/2"]
NOTE: Letters match markings on hardware bags
*Quantities are listed as (LFxxUxP / LFxxUxP-B2B)
M5 x 12mm