36
3. Installation
3.5
Battery assembly on the empty battery cabinet 3 110 94
WARNING
Do not move the EBC after the installation of the batteries
INDICATION
It is mandatory to properly fill out the product label after the installation of the batteries
STEP 1: Remove the right/left side panel.
STEP 2: To install battery in the battery bank
STEP 3: Install the battery guardrail.
STEP 4: Using nylon rivet to fix mylar film.
STEP 5: Connect Anderson terminal.
STEP 6: Install the fuse into the fuse holder.
STEP 7: Measure the voltage of terminal block to ensure the battery connections are correctly.
STEP 8: Install the right/left side panel.
STEP 1
STEP 2
STEP 1
STEP 3
Summary of Contents for 3 110 94
Page 15: ...External Battery Cabinet Keor Compact 15 FR PHASE 4 PHASE 5 PHASE 6 PHASE 7 PHASE 8...
Page 37: ...External Battery Cabinet Keor Compact 37 EN STEP 4 STEP 5 STEP 6 STEP 7 STEP 8...
Page 40: ...40 3 Installation Battery 7AH 9AH 30pcs 2strings STEP 1...
Page 59: ...External Battery Cabinet Keor Compact 59 IT STEP 4 STEP 5 STEP 6 STEP 7 STEP 8...
Page 81: ...External Battery Cabinet Keor Compact 81 DE SCHRITT 4 SCHRITT 5 SCHRITT 6 SCHRITT 7 SCHRITT 8...
Page 103: ...External Battery Cabinet Keor Compact 103 ES PASO 4 PASO 5 PASO 6 PASO 7 PASO 8...
Page 113: ...External Battery Cabinet Keor Compact 113 ES...
Page 114: ...114...