H03702:02/04
4
S
TEP
4 - D
IAGRAM
4:
B
UILD
U
P
OF
S
TATIONARY
S
IDE
TO
H
EAD
& F
OOTBOARD
.
Align the receiving holes in
each end of the Stationary
Side
W
with the receiving
holes located in corner
posts of Footboard
X
and
Headboard
Y
. Insert an
Allen Bolt
R
into each of
the
(4)
receiving holes and
allow each to pass through
the corner posts of Head-
board
Y
& Footboard
X
,
then into the receiving holes
in each end of the Station-
ary Side
W
. Insert each of
the
(4)
K-D Bolt Plugs
L
as
shown. Pull out each Allen
Bolt
R
just enough to allow
the K-D Bolt Plug
L
to be
fully inserted in the receiv-
ing hole. Tighten all
(4)
Allen Bolts
R
until secure
using the Allen Wrench
(enclosed)
while secur-
ing K-D Bolt Plugs
L
with a
standard slotted screw-
driver.
CAUTION: DO NOT
OVERTIGHTEN.
Z
R
L
Top position
Middle position
Lowest position
R
R
L
L
W
X
T
NOTE: Drawer Rails installed during Step 2 are not shown in this diagram for clarity.
X
S
TEP
5 - D
IAGRAM
5:
I
NSTALLATION
OF
D
ROPSIDE
.
PREPARATION FOR INSTALLATION OF DROPSIDE:
Loosen the four Slotted/Phillips Screws
A
which attach
the Stabilizing Bar
T
to the Headboard
Y
and Footboard
X
to prepare for Dropside
V
V
V
V
V
installation. Back out these
(4)
Screws a full
(8)
revolutions each, but do not remove
the screws
.
The Stablizing Bar
T
will now be loose.
Install Dropside
V
by following substeps
I
through
IV
listed below. Refer to
Diagram
.
(It would be helpful to
have a friend assist you with this procedure.)
Note: the
outside location of Dropside
V
V
V
V
V
as shown in Dia-
gram.
I.
Note:
During the Dropside
V
installation procedure
use extreme caution when Top Tracks and Lower Tracks
make contact with Upper Guide Bushings
C
C
C
C
C
and Lower
Guide Pins
D
D
D
D
D
so as not to damage the finish of this crib.
II.
Insert the Upper Guide Bushings
C
C
C
C
C
(mounted to
Footboard
X
and Headboard
Y
in
STEP 2
)
into the
Upper Tracks
(metal)
which were factory mounted to
Dropside
.
Hold the Dropside
V
at approximately 30
degrees from vertical as shown in
Diagram
.
III.
Once both ends are engaged, then carefully allow
Dropside
V
to slide downward. Then rotate the bottom
end of the Dropside
V
until it is nearly vertical.
(
Note:
Rotation will be stopped when the dropside
V
touches
the Lower Guide pins
D
D
D
D
D
.)
Carefully let the Dropside
V
slide down until it is as low as it can go.
IV.
READ THIS STEP COMPLETELY BEFORE PRO-
CEEDING
. Next, lift Dropside
V
V
V
V
V
approximately two inches
(2") vertically. This will put Dropside
V
in the proper
vertical alignment with the Lower Guide Pin
D
D
D
D
D
which will
be inserted into the Lower Tracks
(Right & Left)
.
V
W
X
II.
Engagement of
Metal Top Track
and Upper Guide
Bushing
C
will
start at bottom of
Top Track (see
enlarged section
view below).
Dropside
V
Cornerpost
Long groove
R
Footboard
X
Corner Post
III.
Lower Track
(Plastic)
NOTE:
Place
short groove toward
inside of crib.
30
°
Outside face of Dropside
D
T
NOTE: STEP 5 DIAGRAM 5 CONTINUED AT TOP OF PAGE 5