
6.5.7 Front Panel Controls Do not Operate
Are Power Supply
Voltages on CPU
Board P11
Correct ?
See Power
Supply Problem.
Are Power Supply
Voltages Correct
on CPU Board J6
#4,5 ?
Replace CPU
board.
Do a General Reset.
Is Flat Cable to
Panel Correctly
Installed ?
Replace CPU board.
Replace Front
Panel.
Y
N
Y
N
Y
N
Replace Main
Board.
End
Reseat or
Replace Flat
Cable from CPU
board J6.
Start
Maintenance
6-11
Summary of Contents for Waverunner2 LT262 Series
Page 1: ...LTXXX2 SM E LeCroy Waverunner2 Series Service Manual Version D December 2003 ...
Page 30: ...4 12 Theory of Operation Block diagram 1 HAM631 ...
Page 55: ...Rev D Performance Verification 5 19 ...
Page 62: ...5 26 Performance Verification Rev D Set Global BWL 200 MHz Set Timebase 5 nsec div ...
Page 80: ...5 44 Performance Verification Rev D a Pulse Width 10 nsec b Pulse Width 10 nsec ...
Page 84: ...5 48 Performance Verification Rev D ...
Page 86: ...Rev D 2 of 12 This page intentionally left blank ...
Page 96: ...Rev D 12 of 12 LT584 LT374 372 LT354 LT264 262 Test Record This page intentionally left blank ...
Page 114: ...6 18 Maintenance ...
Page 126: ...7 12 Mechanical Parts Removal F2 ...
Page 154: ...Mechanical Part Removal 7 21 ...