6-4
Maintenance
6.3
Equipment and Spare Parts Recommended for Service
6.3.1 Test Equipment Required
See Table 5-1 in section 5.2.
6.3.2 LT Series Spare Parts
Parts
Number
Assembly
Adjustments or
Confirmations
Performance
Tests
213025610
CPU Board without DRAM
6.4.1
None
213025605
Main Board for LT344/344L
without HMM436’s
6.4.2 None
213025650
Main Board for LT342/342L
without HMM436’s
6.4.2 None
213025648
Main Board for LT322
without HMM436’s
6.4.2 None
213025670
Main Board for LT224
without HMM436’s
6.4.2 None
213025700
Main Board for LT364
without HMM436’s
6.4.2 None
213025678
Front Cover(4CH)for LT344/224
None
None
213025679
Front Cover(2CH) for LT342/322
None
None
213025680
8.4”Color TFT LCD Display Assy
None
None
213025615
Power Board
6.4.3
None
DMB020691
Floppy Disc Drive
None
None
213025681
Printer Assy
None
The other parts are not on the above list because the probability of failure is very low.
See
chapter 7 and
8 for mechanical and electrical replaceable parts.
6.4
Board Exchange Procedure
6.4.1 Processor Board Exchange Procedure
The serial number of the LT Series oscilloscope is loaded in the real time clock
memory which is battery backed up. If it becomes necessary to replace the
processor board, the serial number must be loaded in the memory of the new board
by using LeCroy program " LeCalsoft " under GPIB remote control.
To run " LeCalsoft " type SKP.exe, in the main menu type S, and follow the
instructions, use five digits to enter the serial number ( i.e. 10281).
Then check in the system summary, by using the show status button on the front
panel, the scope serial number.
6.4.2
Main Board Exchange Procedure
After Main Board is exchanged, adjust as the following method.
Summary of Contents for Waverunner2 LT262 Series
Page 1: ...LTXXX2 SM E LeCroy Waverunner2 Series Service Manual Version D December 2003 ...
Page 30: ...4 12 Theory of Operation Block diagram 1 HAM631 ...
Page 55: ...Rev D Performance Verification 5 19 ...
Page 62: ...5 26 Performance Verification Rev D Set Global BWL 200 MHz Set Timebase 5 nsec div ...
Page 80: ...5 44 Performance Verification Rev D a Pulse Width 10 nsec b Pulse Width 10 nsec ...
Page 84: ...5 48 Performance Verification Rev D ...
Page 86: ...Rev D 2 of 12 This page intentionally left blank ...
Page 96: ...Rev D 12 of 12 LT584 LT374 372 LT354 LT264 262 Test Record This page intentionally left blank ...
Page 114: ...6 18 Maintenance ...
Page 126: ...7 12 Mechanical Parts Removal F2 ...
Page 154: ...Mechanical Part Removal 7 21 ...