9
Lay down the frame (the bumpers must be on top) and pull on the lams C until the jacks D are parallel with the
lams.
Insert the left support E into the left end of the cloth beam F, then insert the take-up motion handle G and the
right support H, into the right side of the cloth beam. Push all these parts between the sides of the loom and fix
each support with two 1½” (40mm) round-headed screws No. 14.
Bumpers
Bumpers
D
C
Fig. 1
Screws no 14
1½” (40 mm)
E
F
H
G
Heavy part on the back
of the loom
Make sure that the
ratchet pawl is in the
correct position.
Fig. 2
ATTENTION:
Application
of soap to the
screws will
make their
insertion
easier.