background image

1

1573 Savoie
C. P. 4 Plessisville, Qc.
G6L 2Y6
TEL: 819-362-7207
FAX: 819-362-2045
www.leclerclooms.com
[email protected]

Loom Prepared by:_____________

Inspected by:_________________

Date:____________________

 

On receiving the  loom, unpack and lay 

out the loom components.

Do NOT discard any packing material until all 

parts are inventoried. 

  

Check the parts received against the 

parts list on pages #2 to #6 of the assembly 

instructions. Report any discrepancies to 

Leclerc immediately. 

To assemble this loom, a minimum of 2 
people are needed but  it is recommended 
you use 3.

   ARTISAT 36”  JACK-TYPE 

8 SHAFTS BACK HINGE 

TREADLES 

1009-3628

14 1/8"

IMPORTANT

Summary of Contents for 1009-3628

Page 1: ...the loom unpack and lay out the loom components Do NOT discard any packing material until all parts are inventoried Check the parts received against the parts list on pages 2 to 6 of the assembly ins...

Page 2: ...push nut 1 MORE PUSH NUT 7 16 2 TREADLE set SUPPORTS 41 cc Note for Leclerc in French 4 Corde de frein coton 40 5 Surveiller l amanchement avec les pattes avant 39 Note for Leclerc in French 1 Poser...

Page 3: ...5 YDS FOR BEAMING AND LEASE STICKS 1 SHUTTLE 1 DOZ BOBINES 4 1 CLOTH BEAM WITH RATCHET WHEEL wood 38 1 8 1 WARP BEAM WITH BRAKE DRUM wood 38 7 8 1 TAKE UP MOTION HANDLE 1 BATTEN HANDTREE 1 BATTEN SLEY...

Page 4: ...ece 1 stabilizing post cross member assembly with 2 stabilizing back posts 1 Treadle Separator 40 long 10 Treadle springs with Loop cords 9 back part 20 3 8 Note for Leclerc in French La planche avant...

Page 5: ...ASE STICKS 1 BEAM STICK 3 WARP RODS 1000 HEDDLES 1 HEDDLE AND REED HOOK 8 5 8 long 6140 9000 1 Black Screwdriver 1 Red Screwdriver 1 Adjustment wrench 10 treadle hooks 10 10 pegs to lock the treadle h...

Page 6: ...d screws 6 14 X 2 50 mm 2 8 1 treadles separator 8 12 1 jack box 6 8 1 stab post hinges 6 14 2 base Flat head screws 4X 12 X 1 38 mm castle top 2X eye screws 10 Loop cords 18 long for treadle rocker I...

Page 7: ...he base to the left upright and the back post to the base 14 round head screw 2 14 round head screw 2 Lay the right side on the floor with caution you can put a piece of cardboard on the floor Removed...

Page 8: ...hand side A The lower middle cross member has a hole at either end the narrow sides B1 must be above and under the cross member and the wide faces B2 must be on the sides Unfold the front section of l...

Page 9: ...nd of cloth beam F into the holes in upper front cross members G and G The hole in lower middle cross member B must be right beside the hole at the bottom of right hand side A Using a 2 50 mm round he...

Page 10: ...10 Using x 3 6mm x 80mm carriage bolts plus 6mm steel washer and square nuts attach front cross member A to front posts B and B...

Page 11: ...ar Stabilizing assembly A to the Warp Beam Posts using 6 Round Head Screws 8 1 Anchor the hook B to the stabilizing post of the loom using 2 carriage bolts 2 and 2 wing nuts the wings nuts go on the o...

Page 12: ...le set in or out of the loom as shown in picture using 1 treadle rod 27 10 treadles 9 wood spacers 2 treadle blocks 2 x 9 16 washers 2 X push nuts 7 16 one is already on the rod Affix treadle set to t...

Page 13: ...the heddles in the shaft frames see WARP AND WEAVE on page 10 Remove the saran wrap on the jack box Slide shaft frames T between dividers Q The shaft frames must rest on the plastic supports U of the...

Page 14: ...he S hook of the jacks D to the eyelet of the FLOATING lam E Castle cover Complete the assembly by secur ing the Castle cover with 4 12 1 flat screws Make sure to screw into the pre drilled holes of t...

Page 15: ...e nuts attach the batten sley A with shuttle race to the batten swords B Then affix the batten handtree C to the batten swords B Install reed D in the slots of batten handtree C and batten sley A Adju...

Page 16: ...bolts of the batten sley and batten handtree and exert pressure on the batten centering it in its proper place Tighten the bolts again You can install now or just before weaving the treadles springs...

Page 17: ...D up slightly to the rear of the loom Insert one end of the warp beam which has only a metal post into the left hand side back post Insert the friction brake drum of the warp beam into the circular w...

Page 18: ...end of the warp beam into the hole of the right hand side back post Install the 7 16 X 3 machine bolt through the right hand side back post and into the warp beam Using crank E tighten the machine bol...

Page 19: ...nd this is the warping rotation However you should always release the tension on the friction brake system by disconnecting the spring from the loop cord S hook when you are warping the loom To advanc...

Page 20: ...Slide the Treadle Hook through the Screw Eyes and the treadle Cord Loops Before the last Screw Eye insert the Hook through the Treadle Spring loop cord and secure with the peg in the front In the Trea...

Page 21: ...tting the shafts at the correct Level See next page for more info on adjusting the length of each rocker loop cord Loop cord screw Treadle spring Rocker loop cord VIEW FROM THE BACK OF THE LOOM SHOWIN...

Page 22: ...les Picture 32 shows an uneven Shed caused by Rocker Loop Cords being out of adjustment Picture 33 shows properly adjusted Rocker Loop Cords with the bottom Shed just kissing the Race Plate and the To...

Page 23: ...nds equal in length of this cord through the middle holes of the warp beam Continue threading the cord through the warp beam and beam stick A Knot the cord at each end of the beam stick Adjust the cor...

Page 24: ...operation with the other end of the lease sticks The lease sticks will then be held at a practical height for threading We at Leclerc encourage Weaver feedback on this and all our products Please sen...

Reviews: