40
INTRODUCTION
This manual shows the maintenance of the solid jet
High Impact Tank Cleaning Machine
Series 5TA
from Lechler GmbH.
We recommend performing maintenance a minimum of every
300 operating hours
.
Depending on the operating conditions, corresponding maintenance intervals are recom-
mended. For example, under harsh operating conditions, the time in between maintenance
intervals should be reduced. Always visually inspect the parts for wear at each maintenance
interval. O-rings should be replaced after each time a sealing point is opened.
Notes:
While assembly tools can be reused, new maintenance parts are required for
each maintenance interval.
Use compatible lubricant for EPDM O-rings.
OVERVIEW MAINTENANCE PACKAGE
The maintenance parts and the assembly tools are both needed for the maintenance of the
5TA. The assembly tool package includes the tools and maintenance parts required for
maintenance. Since the assembly tools can be reused, it is possible to order the maintenance
parts separately.
Order number Assembly tool package incl. maintenance parts: 5TA.400.31.22.17.0
Order number maintenance parts:
5TA.400.31.22.23.0