SU-56 Operation Manual
and software version are all correct.
6.
When a new work order or a new IC is launched for the first time
every day, the IC programmed in the first round must be verified
first to avoid errors in the master tape, file, machine or operating
software, resulting in poor programming. Cause unnecessary losses;
during mass production programming, you must verify whether the
programming IC is normal, including programming program,
component parameter setting, component security protection
setting, specific area setting, bad block (NAND Flash) and other
settings.
7.
The operator of the machine should be trained and designated
personnel, and do not allow untrained personnel to operate.
8.
During the warranty period, self-maintenance is prohibited without
the consent of the company.
9.
If you find any burning problems that cannot be handled, please
suspend use.
10. The company is willing to deal with the customer's burning
problem, but please abide by the above operation statement.
If
there is an operation that violates the statement, the company
will not be responsible for the loss caused by machine failure,
IC damage or burning of wrong data. any liability.
-
5̶̶
-