Leaf LT88 / LT88E manual
Page 2
Of 22
Document Status
Client:
Nexus
Status:
Controlled external release
Authorised by:
AFG
Comment Closure Date:
Revision History
Version
Date
Changes
1
10/08/11
Initial release
2
23/11/11
Revised
3
9/12/11
Added content
4
23/02/12
Added content
5
16/05/12
Added content
6
26/9/12
Vary text
7
26/05/14
Product name change
NOTE:
During initial set up and during any changes to the
installation, please switch off and unplug mains power
(from this system and any equipment that is to be
connected to it) prior to connecting any leads / cables.
Plug in and switch power back on again after all
interconnection leads are in place.
Do not run HDBaseT / Zone Cat5e/6 cabling with or in
close parallel proximity to mains power cables.
Do not connect any part of this equipment to Power
Over Ethernet devices. Damage may result.
During operation the Leaf LT88 / LT88E and
associated LTB1 / LTB1E breakouts may feel quite hot
to the touch. This is normal. Please ensure that these
items have sufficient cool air flow around them.