
WSE EVAPORATOR MANUAL
WSE Operations Manual
Year: 2018
PAGE: 25
2.
The rear of the flue pan is the end where the
sides do not have ferrules welded. Place the flue
pan on the arch so the rear of the pan is on the
rail gasket and against the stack collar
projection.
3.
Loosely thread a thumbscrew into the mounting
bracket on the side of the flue pan. Use the
bracket on the same side as the draw off is to be
installed (left draw - bracket on left, right draw -
bracket on right).
4.
Slide the float box brace into the bracket where
the thumbscrew is installed. Ensure the float
box ferrule is facing the flue pan ferrule.
5.
Place a 1 ½” Teflon gasket between the flue box
and float box ferrules. Ensure the gasket aligns
with the grooves in the ferrules
.
6.
Loosen the wing nut on a 1 ½” clamp and open
up the clamp. Place the clamp over the ferrules
and gasket. Align the clamp so the wing nut
faces down. Close the clamp with the wing nut
and tighten enough to securely hold the float
box.
7.
Tighten the thumbscrew in the bracket.