Electrical Requirements
54
Part No. 70476501ENR7
1 Terminal Block
2 Earth/Ground
3 Electrical Service
4 Contactor Box
Figure 19 Ground and Terminal Block Locations for Electric Models
To Connect Electrical Service To The
Tumble Dryer
The following steps outline the procedure for connecting
the electrical service to the tumble dryer.
NOTE: The wiring diagram is located in the junction
box.
1. Install a circuit breaker as close to the tumble dryer as
possible. If more than one tumble dryer is being installed, a
disconnect switch or circuit breaker should be provided for
each. This will make it possible to disconnect each tumble
dryer for maintenance purposes.
2. Connect the conduit-encased leads to the disconnect switch,
or circuit breaker. Connect the wire leads to the appropriate
labeled terminal on the terminal block. The ground wire
must be connected to the ground connection as shown in
Figure 17 Ground and Terminal Block Locations for Non-
CE Gas and Steam Models, Figure 18 Ground and Terminal
Block Locations for CE Gas and Steam Models or Figure 19
Ground and Terminal Block Locations for Electric Models .
3. Check the electrical service phase sequence (three phase
only). If one of the power leads is a “high leg,” connect it
to lead L3 in the tumble dryer. The cylinder must rotate
clockwise and the fan must rotate counterclockwise (as
viewed from the front of the tumble dryer – with selector
switch in non-reverse position). If not, interchange leads L1
and L2 in the tumble dryer connection box.
Jumper Configuration Instructions
Changing the transformer configuration jumper is required,
PRIOR TO SUPPLYING POWER TO THE MACHINE, if any
of the following apply:
IMPORTANT: Failure to install the proper
configuration jumper may result in damage to
sensitive electronic controls and may void warranty.
•
You have 400 – 415 Volt service and are connecting a model
rated for 380 Volt operation.
Ferrite Ring Installation
Gas and Steam Models with RM Control Suffix Only (Models Through 7/31/11)
The ferrite ring provided in the literature packet must be installed over the power leads during connection of electrical
service. The ferrite protects the sensitive electronic controls from destructive electrical disturbances which may be present
Summary of Contents for GA120L
Page 2: ......