background image

 

 

 

 

 

 

 

 

 

 

 

 

 

V1.01.000 

2015-09-23                 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for X-831M

Page 1: ...V1 01 000 2015 09 23...

Page 2: ...request written permission to use Materials on this manual for purposes or for all other questions relating to this manual Copyright Information Copyright 2015 by LAUNCH TECH CO LTD All rights reserv...

Page 3: ...for a long time during the instrument is working The targets of X 831M wheel aligner are the key components for testing Do not damage their structures when using and storing Keep the surface of target...

Page 4: ...y 8 Components Structure 9 Overall Structure 9 Post Assembly 9 Cameras and Lateral Beam Assembly 9 Cabinet 9 Targets and Wheel Clamps 9 Turntables and Transition Bridges 9 Installation and Adjustment...

Page 5: ...e wheel aligner and then select suitable installation position Working flow If there is no Spot Inspection Item Table before Installation please fill out another kind of the table Every measurement mu...

Page 6: ...g 2 1 1 Lateral beam 2 Lateral beam fastening iron sheets 3 Post fastening iron sheets 4 Post Accessory Carton Two front targets two rear targets two mechanical turntables printer four wheel clamps fo...

Page 7: ...ts List Fig 3 1 Components List Note Take the parking list as the criterion No ERP Code Part Name Qty 01 206010597 Lateral beam assembly 1 02 206010599 Post assembly 1 03 206010590 FL Front target ass...

Page 8: ...LAUNCH X 831M Wheel Aligner Installation and Parts Manual Parts List 4 Structures of Main Components Post assembly Fig 3 2...

Page 9: ...ion limited block 4 P06 Plain washer GB T95 2000 5 2 P21 104011558 Position limited rolling wheel 4 P07 Hexagon nut GB T6170 2002 M5 2 P22 101060029 Pull rope 1 P08 103070029 Zinc alloy bearing with b...

Page 10: ...8 Front decoration plate 1 B04 103209019 Decoration support plate 1 B05 Cross recessed countersunk head screws GB T819 1 2000 M4 10 2 B06 101050117 Aluminum alloy support plate 2 B07 08990014 Camera a...

Page 11: ...Part Component Name Qty F01 107022380 Target label 1 F02 104011261 Front target casing 1 F03 103010266 Hexagon plane end set screws GB T77 2000 M5 12 1 F04 103203283 Target pin shaft 1 F05 103040021...

Page 12: ...Part Component Name Qty F01 107022380 Target label 1 F02 104011262 Rear target casing 1 F03 103010266 Hexagon plane end set screws GB T77 2000 M5 12 1 F04 103203283 Target pin shaft 1 F05 103040021 P...

Page 13: ...n Fig 4 1 Fig 4 1 The computer group includes computer monitor keyboard mouse and printer The monitor is on the top platform of the cabinet Mouse and keyboard are on the keyboard drawer Printer is on...

Page 14: ...urntable before driving the vehicle on Pull out the lock pin after the vehicle is stopped and the front wheels are at the centers of the turntables While testing try your best to keep the vehicle fron...

Page 15: ...e work should be performed and it can be used after completely concreted and dried Confirm the Installation Position The position relationship of post and lift is as shown in Fig 5 1 Fig 5 1 1 Confirm...

Page 16: ...cable from the cabinet to the power supply interface and USB data interface at the lower end of the mainboard as shown in Fig 5 7 Fig 5 7 7 After the power cables and data cables are all connected we...

Page 17: ...LAUNCH X 831M Wheel Aligner Installation and Parts Manual Installation and Adjustment 13 Fig 5 8 Installation calibration diagram...

Page 18: ...t Click OK icon the next interface is as shown in Fig 5 11 Fig 5 11 According to the prompts on the interface please press down the spring snap and then click OK icon The next interface is as shown in...

Page 19: ...he target is changed Please do not perform the calibrating operation in normal test operation process Target Calibration After the camera recalibration it is required to perform the target calibration...

Page 20: ...terface is as shown in Fig 5 22 Fig 5 22 According to the prompts on the screen finish the calibration operations for FR RR and RL wheels respectively The interface is as shown in Fig 5 23 Fig 5 23 Pu...

Page 21: ...t Target Monitoring how to handle it First check if cable connection of video camera and illumination is right and the illuminating lamp is lightened Secondly check the light path Sway a target near t...

Page 22: ...e Evaluation Comments Post installation height vertical distance from ground to post top 2653mm Height of positioning platform vertical distance from ground to turntable top AH 0 1800mm Post base dist...

Reviews: