![Lauda Ecoline RE 320 Operating Instructions Manual Download Page 24](http://html1.mh-extra.com/html/lauda/ecoline-re-320/ecoline-re-320_operating-instructions-manual_3948622024.webp)
Preparations
18
−
Using the setting knob at the pump outflows, divide up
the pump flow in accordance to the thermostating
task.(
➾
Section 5.1)
−
Position
➀
➀
➀
➀
!
maximum flow in the external circuit
(setting knob turned anticlockwise).
−
Position
➁
➁
➁
➁
!
flow passes through pump outflow and
outlet for bath circulation (setting knob in medium
position).
−
Position
➂
➂
➂
➂
!
external circuit is closed and the outlet for
bath circulation fully open (setting knob turned
clockwise).
−
Operate the setting knob only when the bath contents are near the ambient
temperature.
−
When no tubing is connected, close the pump connection with closing plugs even
in position
➂
.
Summary of Contents for Ecoline RE 320
Page 2: ......
Page 8: ...Brief operating instructions 2...
Page 59: ...Circuit diagram 10 08 99 YACE0060 53 11 Circuit diagram...
Page 60: ...Circuit diagram 54...
Page 63: ...Pipe plan 16 08 99 YACE0060 57 12 Pipe plan...
Page 64: ...Pipe plan 58...
Page 65: ...Pipe plan 16 08 99 YACE0060 59...
Page 68: ......