STU CAMERA INSTALLATION
Items Provided
STU unit (triangular box 9” x 7.25” x 4.25”)
Mounting Options
Magnetic Mount
Saddle Mount (pictured to right)
Bolt-on Mounting Plate
Items Needed
Lift, ramp or other approved system able to reach mounting location
Installation Procedure
9.
Remove STU from its delivery box
10.
We HIGHLY RECOMMEND putting the STU outside in direct sun as soon as
received to allow for solar charging of the batteries (even if you are not installing
right away). If the internal batteries are completely dead then the STU will require at
least 1 to 3 hours in the sun to start reporting and 24 to 48 hours of sun to charge its
internal batteries fully.
NOTE: if your unit has magnetic mount then it also has a choice for a 9volt battery
installation on the back of the unit. This will help boost the unit’s initial power but is
not enough power to run the unit.
11.
Determine mounting location on asset. A suitable mounting location has the
following:
M.
Provides exposure to the sun.
N.
Provides a relatively flat surface for attaching system.
O.
Is high enough so that the unit is out of reach.