16. One person is to operate the winch whilst a second person lifts the mast
halyard to
8. With the mast in the upright position – take the
9. Using
e winch
w
ch
LEASE NOTE; The first time the rig
the
s
from the cradle and walks up the boat whilst the winch is reeled in.
17. A third person can assist in the operation by using the gennaker
assist the mast erection.
1
gennaker halyard and secure it to the trailer. Cleat
off the gennaker halyard at the mast. This is purely
as a safety line whilst attaching the forestay.
1
th
SLOWLEY
engage the forestay clevis pin. Atta
the ring to the pin and then release the
winch. DO NOT OVERWIND THE
WINCH.
ind the rig forward to
set up of the rig, the bottle screws can
of raising the mast will enable the rigs
P
is assembled the bottle screws will be
in their extended position prior to
setting up the rig. Subsequently to
be left set in position and this method
ettings to remain.
Summary of Contents for SB3
Page 1: ...RIGGING MANUAL ...